A D V E R T I S E M E N T

S A P - R E S O U R C E S


Get Free SAP Resources:

Are you looking for:
  • SAP Jobs
  • Free SAP eBooks
  • SAP Softwares
  • SAP Tutorials
  • ERP Implementation Examples
Enter Email Address:
(Enter your email address above and we will instantly send you the download link to you, when you confirm your email.)
Search SAP Resources:

SAP Certified Application Associate Planning & Manufacturing with SAP ERP 6.0

Questions

1. What options does the SAP ECC system offer for retrieving the available capacity for work centers?

There are three correct answers to this question.

a)

O

Attendance list

b)

O

Standard available capacity

c)

O

Shift plan

d)

O

Interval of available capacity

e)

O

Shift sequence

2. You enter a new BOM in SAP ECC but forget to enter a plant reference. Which of the following statements is true regarding what happens when you try to save it?

Please select the correct answer.

a)

O

When saving the BOM, a group BOM is created which can, under certain conditions, be assigned to a plant later.

b)

O

When saving the BOM, a dialog box appears prompting the user to enter a plant.

c)

O

When saving the BOM, an error message appears stating that it is not possible to save a BOM without a plant reference.

d)

O

When saving the BOM, a warning message appears. In the corresponding dialog box, it is possible to create a plant-specific engineering BOM.

3. In the SAP ECC system, you interpret the result of a routing schedule.

When scheduling a routing in the SAP ECC system which of the following time elements are interoperation times?

There are two correct answers to this question.

a)

O

Safety time

b)

O

Floats before and after production

c)

O

Processing time

d)

O

Move time

4. During the implementation of SAP ECC material requirements planning the project team defines MRP controller numbers in Customizing under the entry "Define MRP Controller" that can be assigned to the planners responsible for the material.

Which statements about these MRP controller numbers are true?

There are two correct answers to this question.

a)

O

The MRP controller number is a central selection criteria for evaluating material requirements planning.

b)

O

A planner responsible for a material can have multiple MRP controller numbers.

c)

O

In multilevel single-item planning, materials are selected using the MRP controller number.

d)

O

The MRP controller number is assigned using the production version.

5. The customer you are advising uses a plant data collection system from the XYZ company and would like to distribute production orders to the terminals of this system as well as entering feedback using these terminals. Which integration possibilities would you recommend so that as little work as possible is required for the customer to implement this?

Please select the correct answer.

a)

O

SAP Manufacturing Integration and Intelligence(SAP MII)

b)

O

The plant data collection interface (PP-PDC)

c)

O

Execution steps (XSteps)

d)

O

The process control system interface PI-PCS

6. Which of the following possibilities for the conversion of planned orders into production orders are available?

There are three correct answers to this question.

a)

O

Mass processing

b)

O

Automatically in the planning run (MRP)

c)

O

Background processing in a program

d)

O

Customizing for the planned order

e)

O

Order progress report

7. You have a project in an integrated network consisting of SAP ECC and SAP SCM-APO and are mapping the program planning for an important end product in SAP SCM-APO.
In which system (SAP ECC or SAP SCM) can the corresponding primary requirements (sales orders, planned independent requirements) be administered?

There are two correct answers to this question.

a)

O

Planned independent requirements can be administered in SAP ECC or SAP SCM-APO.

b)

O

Sales orders can be administered in SAP ECC or SAP SCM-APO.

c)

O

Sales orders can only be administered in SAP ECC.

d)

O

Sales orders can only be administered in SAP SCM-APO.

e)

O

Planned independent orders can only be administered in SAP ECC.

8. Which statements are true for the reorganization of planned independent requirements in SAP ECC?

There are two correct answers to this question.

a)

O

The reorganization only affects planned independent requirements that lie on a time axis to the past from a specified key date.

b)

O

The reorganization can be parameterized using a plant-specific reorganization interval.

c)

O

The reorganization only deletes planned independent requirements that have no fixed planned orders to them.

d)

O

The reorganization is a form of demand adjustment that is undertaken in the planning group and only sets the status of non-settled planned independent requirements for the planning to inactive but does not delete them.

9. Which BOM selection possibilities are available for opening a production order?

There are two correct answers to this question.

a)

O

Manual selection

b)

O

Automatic selection controlled with Customizing settings

c)

O

Selection by BOM number in the material master of the material to be produced

d)

O

Selection using the production scheduling profile

e)

O

Selection using a production version

Solutions



1 a) Incorrect

2 a) Correct

3 a) Incorrect

4 a) Correct

5 a) Incorrect

1 b) Correct

2 b) Incorrect

3 b) Correct

4 b) Correct

5 b) Correct

1 c) Incorrect

2 c) Incorrect

3 c) Incorrect

4 c) Incorrect

5 c) Incorrect

1 d) Correct

2 d) Incorrect

3 d) Correct

4 d) Incorrect

5 d) Incorrect

1 e) Correct





6 a) Correct

7 a) Correct

8 a) Correct

9 a) Incorrect


6 b) Incorrect

7 b) Incorrect

8 b) Correct

9 b) Correct


6 c) Correct

7 c) Correct

8 c) Incorrect

9 c) Incorrect


6 d) Incorrect

7 d) Incorrect

8 d) Incorrect

9 d) Incorrect


6 e) Correct

7 e) Incorrect


9 e) Correct





More SAP - PM Sample Paper
 
1


A D V E R T I S E M E N T

discussionDiscussion Center
Discuss
Discuss

Query

Feedback
Yahoo Groups
Y! Group
Sirfdosti Groups
Sirfdosti
Contact Us
Contact
Sign in

User Name:
Password:
Forget password? | Register


INTERVIEW EBOOK

Get 30,000 Interview Questions & Answers in an eBook.

Interview Success Kit - Get Success in Job Interviews


Send your Resume to 6000 Companies

SAP Resources

  • SAP Articles
  • SAP Books
  • SAP Certifications
  • SAP Companies
  • SAP Study Materials
  • SAP Events
  • SAP Faqs
  • SAP Jobs
  • SAP Job Consultants
  • SAP Links
  • SAP News
  • SAP Sample Papers
  • SAP Interview Questions
  • SAP Training Institutes
  •  
    SAP Tutorial

  • Introduction
  • SAP History
  • SAP Facts
  • SAP Tables
  • SAP Function
  • SAP Report
  • Reasons To Use SAP
  • SAP Landscape
  • SAP Transaction Code
  • SAP Lotus Notes Integration
  • Business Connector and XML
  • Enterprise Release 4.7

  • SAP Training Institutes

  • SAP Training Institutes
  • Job Consultants Address
  • SAP Companies Address

  • Business Process Cycle

  • Analyze
  • Design
  • Implement
  • Operate
  • Optimize
  • Skills And Education

  • Logistics Module

  • Sales and Distribution
  • Quality Management
  • Materail Management
  • Plant Maintenance
  • Financial Modules (FI/CO)
  • Project system
  • Production Planning
  • Service Management

  • SAP NetWeaver

  • Introduction
  • Object Model
  • Interoperability
  • Creating Web Apps
  • Java Connector
  • Advantages & Conclusion
  • Life Cycle Management
  • Composite Application Framework

  • SAP Tools

  • SQL Trace Tool
  • SAP CRM
  • SAP SRM
  • SAP SCM
  • SAP ERP
  • SAP BW

  • SAP Modules

  • SAP FI Module
  • SAP CO Module

  • SAP Technical

  • SAP ITS Architecture
  • Financial Management
  • Manufacturing Planning and Execution
  • Customer Order Management
  • Lackbox Processing
  • SD and Financial Accounting Integration
  • SAP - HR (Human Resource)

  • SAP Miscellanous

  • Web Application Server(WAS)
  • Data Archiving
  • Mobile Engine
  • SAP Script
  • SAP Transactions
  • SAP Business Warehouse(BW)

  • SAP Reference

  • SAP Facts
  • SAP Tables
  • SAP Function
  • SAP Report
  • SAP Landscape

  • SAP Others

  • SAP Treasury
  • SAP Finance
  • SAP WAS
  • SAP Data Archiving
  • SAP ALE
  • SAP EDI
  • SAP Exchange
  • SAP X-APPS
  • SAP Applications Components
  • SAP Software
  • Dunning
  • SAP IDES
  • SAP Payroll Basics
  • SAP BASIS and Security Authorization
  • SAP Backup
  • SAP Router

  • ABAP Tutorials

  • Introduction
  • ABAP Transaction
  • ABAP Function
  • ABAP File Processing
  • ABAP Objects
  • ABAP Syntax
  • ABAP Queries
  • SAPMail Using ABAP
  • ABAP Programming Hints

  • SAP Projects & Codes

  • Finding the user-exits
  • Purchase Order Display
  • Batch Input
  • Dynamic Open SQL
  • Creating Extract Dataset
  • Reading database tables
  • Load table from a UNIX file
  • Create subscreen

  • SAP Resources

  • SAP Books
  • SAP Links

  • Interview Question



  • Common Interview Que.
  • ABAP Interview Que.
  • ERP Interview Que.
  • HR Interview Que.
  • MM Interview Que.
  • PP Interview Que.
  • ALE Interview Que.
  • EDI Interview Que.
  • Basis Interview Questions
  • SAP-SD Interview Questions
  • FI&CO Interview Questions
  • BW Interview Questions
  • CRM Interview Questions
  • Interview Questions

  • Careers at SAP

  • Careers in SAP (SAP Jobs)
  • Advertise
  •