What is the procedure to make the Source List automatically appear in Material Master as default if maintained at plant level using OME5?
p { margin-bottom: 0.21cm; }
The maintained source list requirement in OME5 was not maintained the source list for the material, Po can't be released. So it is required to maintain source list for all materials in the plant where the indicator is set if maintain source list at plant level is maintained or it can make use of info record to do so automatically.