← All modules
PP
SAP - PP
SAP - PP consists of the following transaction:
- Create a production order. (CO01)
- Change the amount on the production order, release order for production, and print order. (CO02)
- Create two completion confirmations for the production order (milestone confirmation with back flush and final confirmation). (CO11N)
- Post goods receipt for the order. (MB31)
- Settle the production order. (CO02)
Articles
All PP articles →Interview questions
All PP Q&A →In SAP which is the highest organizational level?
In Level code 0001/0002 etc can the MRP be carried out for one particular level?
For SAP PP module what are the cutover activities followed?
Which is the highest organizational level for Material Master Record PP Data?
What would be the result to plan after it has been converted into production order?
What are the requirements for PIR, Sales Order, and Customer Requirement are reduced after they are produced?
What is the difference between F1 Help and F4 Help?
Is it possible to attach a drawing for a material to BOM and what is the process?
Is it possible to assign one material to more than one operation in a routing?
Where is the Variant Configuration typically used?
Books
All PP books →Sample papers
Downloads
Product Catalog and Online Store on the Internet
Product Cost Controlling Information System
Product Cost Planning
Production lot planning / individual project planning
Production Planning and Control (PP)
Production Planning & Control Workflow Scenarios
Production Resources/Tools (PRT)
Product Lifecycle Management (PLM)
Certifications
Recent PP jobs
All PP jobs →Opportunity for SAP PP At Data Core
3 - 6 Years
Openings for SAP PS At iGATE
4 - 8 Years
SAP PM - QM Consultant Required At Infokall
4 - 9 years
Opportunity for SAP PP At CSC
3 - 5 Years
SAP PP Required At Accenture
3 - 8 Years
SAP PP PM Consultant Requird At HCC
3 - 8 Years
SAP PP PM Consultant Requird At HCC
3 - 8 Years
Requirement for SAP(PP) Consultant @ Pink HR solutions
2 - 3 Years