How does SAP know that an operation has components as indicated by the component allocation indicator?
p { margin-bottom: 0.21cm; }
Component allocation is done by routing maintenance or BOM maintenance for the assembly. This is master data maintenance. As soon as a PO is created, the master data is read into the PO.