How to insert an inspection checkpoint at the end of an operation?
p { margin-bottom: 0.21cm; }
If in process sample is to be defined, assign inspection type 03 in the Material Master.
Then create MICs and assign them in the Routings.
System automatically generates the Inspection Lots