S OneStopSAP
← All interview questions PP

What is the procedure to insert an inspection checkpoint at the end of an operation?

p { margin-bottom: 0.21cm; }

The procedure to insert an inspection is by defining it in the process sample, assign inspection type 03 in the Material Master then create MIC and assign them in the Routings. Then the system automatically generates the Inspection Lots.


Share

Cookies on OneStopSAP

We use cookies for session handling and anonymous traffic analytics. No third-party tracking, no profiling.

Privacy →